Pump Station Design - East Haven, CT

Morgan Point Pump Station

Construction of the Morgan Point Pump Station and the installation of thousands of feet of new sanitary sewers. This station consisted of a new reinforced concrete building over a 6 foot diameter wetwell. The duplex pumping unit consisted of two 3.8 HP motors and two submersible sewage pumps delivering 360 gpm at 25-foot TDH. Control panels, sensors, piping, etc. were all included in the station.

Cove Street Pump Station

This station consisted of a new reinforced concrete building over an eight foot diameter wetwell. The duplex pumping unit consisted of two 3.8 HP motors and two submersible sewage pumps delivering 875 gpm at 30 feet TDH. Control panels, sensors, piping, etc. were all included in the station.

Meadow Street Pump Station

This station consited of a new reinforced concrete building over a 6 foot diameter wetwell. The duplex pumping unit consisted of two 5 HP motors and two submersible sewage pumps delivering 345 gpm at 40 feet TDH. Control panels, sensors, piping, etc. were all included in the station.

 

 

 

 