Roadway Drainage Projects - Middletown, CT

Wadsworth Street Reconstruction

This project consisted of the complete reconstruction of two miles of urban arterial roadway. The project included installation of 9,500 linear feet of storm drainage 15 inches to 36 inches in diameter, and installation of 400 linear feet of a 10' x 2' and 6' x 3' box culvert.

Randolph Road Reconstruction

This project consisted of the complete reconstruction of 3,000 linear feet of rural collector roadway. The project included installation of 2,000 linear feet of storm drainage 15 inches to 30 inches in diameter.

 

 